Monday, June 18, 2012

midford - more precision surveying!


Some excellent information re Midford from Nick Howes.

Have discovered, from photos and stay anchor measurements that the 206 linear yard distance of the upper inner home bracket and consequent 5 push dummy in the 6 foot way is the c. pre 1933 measurement. Sometime in the 30s or 40s the upper inner home was moved some 20 yards south.

5 pull, wrong road arm on the platform is actually 47 linear yards from the box not 35.

49’3” 8 arch viaduct spans are the 1873 measurement. Encased in brick on doubling, reduced the spans to 48’10”, not corrected on the civil engineers returns.

Distance of wrong road arm/down home on long arch bridge is correct if you take the rodding run measurement, not the linear point to point measurement along the track as it snakes up the cutting face and over the top of the long arch bridge at 90 degrees.

concrete wall between the signalbox and station building is not original and about 5 feet further north than it used to be.

No comments:

Post a Comment

Thank you for commenting