Welcome to the 'New Somerset and Dorset Railway'

The original Somerset and Dorset Railway closed very controversially in 1966. It is time that decision, made in a very different world, was reversed. We now have many councillors, MPs, businesses and individuals living along the line supporting us. Even the Ministry of Transport supports our general aim. The New S&D was formed in 2009 with the aim of rebuilding as much of the route as possible, at the very least the main line from Bath (Britain's only World Heritage City) to Bournemouth (our premier seaside resort); as well as the branches to Wells, Glastonbury and Wimborne. We will achieve this through a mix of lobbying, trackbed purchase and restoration of sections of the route as they become economically viable. With Climate Change, road congestion, capacity constraints on the railways and now Peak Oil firmly on the agenda we are pushing against an open door. We already own Midford just south of Bath, and are restoring Spetisbury under license from DCC, but this is just the start. There are other established groups restoring stations and line at Midsomer Norton and Shillingstone, and the fabulous narrow gauge line near Templevcombe, the Gartell Railway.

There are now FIVE sites being actively restored on the S&D and this blog will follow what goes on at all of them!
Midford - Midsomer Norton - Gartell - Shillingstone - Spetisbury


Our Aim:

Our aim is to use a mix of lobbying, strategic track-bed purchase, fundraising and encouragement and support of groups already preserving sections of the route, as well as working with local and national government, local people, countryside groups and railway enthusiasts (of all types!) To restore sections of the route as they become viable.
Whilst the New S&D will primarily be a modern passenger and freight railway offering state of the art trains and services, we will also restore the infrastructure to the highest standards and encourage steam working and steam specials over all sections of the route, as well as work very closely with existing heritage lines established on the route.

This blog contains my personal views. Anything said here does not necessarily represent the aims or views of any of the groups currently restoring, preserving or operating trains over the Somerset and Dorset Railway!
Showing posts with label roadside track. Show all posts
Showing posts with label roadside track. Show all posts

Saturday, May 29, 2010

power ...

Heidelberger Strassenbahnen: Eine Dokumentation uber die Heidelberger Strassen- und Bergbahn AG = Tramways of Heidelberg (Germany) (Archiv) (German Edition)
Tramway and Light Railway Atlas 1996: Germany - Tramway, U-Bahn, S-Bahn, Trolleybus
Schwandl's Tram Atlas Deutschland: Detailed Maps of All German Tram, Light Rail and Underground Networks (English and German Edition)

 
The Parry People Mover uses a flywheel to store energy with no overhead wires or conductor rail needed.


Modern trams use lightweight catenary.


Classic Southern Region conductor rail - cheap but dangerous!


Heavier style main line catenary - here used on a roadside line in Switzerland.

Anna-Jayne has just found this article which could provide the ideal power system for the New S&D - buried electric supply meaning that the system is totally safe (unlike conductor rails), cheap (no expensive masts) and aestetically pleasing (no external presence). This gets easier as each week passes!

Bombardier to test wireless trams in Augsburg

26 May 2010

GERMANY: The Primove induction-based catenary-free electrification system developed by Bombardier Transportation is to be piloted on the tram network in Augsburg, the manufacturer announced on May 26.

Formally unveiled at Bombardier's Bautzen factory in January 2009, Primove uses cable buried beneath the track to produce a magnetic fields which induces electric current for traction power in pick-up coils mounted underneath the vehicle.

It will be installed on a 0·8 km branch from Augsburg Line 3 which serves the city's exhibition centre. This will enable Bombardier to demonstrate the technical capabilities and electromagnetic compatibility of Primove, which is a potential competitor for Alstom's APS ground-level power supply in locations where overhead electrification is considered undesirable.

'Our expectation for the Primove pilot project is to gain further insights into new developments in energy management and energy savings in tramway operations', said Stadtwerke Augsburg Verkehrs Managing Director Norbert Walter. 'We will also co-operate with the Augsburg University of Applied Sciences'.

Bombardier is currently supplying Augsburg with 27 Flexity Outlook trams. The first arrived last year and deliveries will run to the end of this year.


Source
Posted by Picasa