Welcome to the 'New Somerset and Dorset Railway'
Our Aim:
Sunday, July 09, 2006
been away ...
Almost a week away from the station! This is the point where the new bridge will be built, taking trains again down to Radstock and on to Bath.
The side panelling appears around the signalbox.
Looking from the platform through the shop doors. Everything is now falling into place for the 'Midsummer at Midsomer' weekend (15&16 July 2006). Lady Angela has arrived, as has the Queen Mary brake van. There are loads of new lines for the shop, and the catering coach will be fully up and running both days. On Sunday there will be 'Driver for a Fiver' trips all day (between 11 and 4).
This coming weekend is the biggest event of the year for us.
Subscribe to:
Post Comments (Atom)
1 comment:
Thanks!
I'm just one of many who are committed to reopening the line, and our numbers seem to increase every day!
Post a Comment