Welcome to the 'New Somerset and Dorset Railway'
Our Aim:
Thursday, June 06, 2013
hamworthy
A few shots from yesterday's survey visit to Hamworthy, Corfe Mullen and Broadstone. These are from the Hamworthy end of the line.
Top shot shows the S&D bridge with the main line bridge behind. Second shot is of the S&D bridge and the third shows some encroachment on the embankment near here.
This was the first identified 'pinch point', it can be overcome by some slight modification of the buildings (2) or by some reprofiling of the embankment.
This was of course the original route of the 'Castleman's Corkscrew' route via Ringwood and was not part of the S&D. It is the subject of a possible scheme to link Hamworthy to a park and ride north of Broadstone. We also identified scope for a chord line linking just north of this stretch to the main line with a junction facing Bournemouth (more useful for the S&D) of which more tomorrow!
Labels:
Broadstone,
Corfe Mullen,
Hamworthy,
Park and Ride,
Ringwood
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment